Almost there with landscaping. Outside edge landscapers have been brilliant. They've finished the driveway, paved front paths with bluestone, front fence looking good with railway sleepers and render to come soon, side paths and limestone pavers finished, also pool coping and paving done, deck, sandpit, pool equipment storage box done and garden beds prepared in most areas. Now for more soil, plants, grass, decks oiled and finish off the sprinkler system. Almost there.
This will be a blog about our knock down rebuild journey to share with friends & those on a similar journey. We've bought a house in Melbourne inner east & planning on knocking it down to rebuild a big family home for our tribe of kids. Hopefully include information about the demolition process and building with a volume builder like Porter Davis.
Tuesday, 4 August 2015
Landscaping continues & pool render tiling starts
Pool solar installed.
Pool plumbing done.
Landscapers - Starter bars injected into side of pool for coping. Concrete poured around pool.
Pool emptied and render started.
Today they are doing water line tiles and will do rest later. They discovered a few patches of concrete that needed treatment and repair once pool emptied. Some steel exposed and they also jack hammered some areas treated and filled with some material that's stronger than concrete. Complete the rest of render and tiling later in week.
Landscapers done retaining wall to protect neighbours fence.